nothing but datacenters facility nbd-01

the facility's record · 9.2, the image sequences

Sequences

A pass is one render of the whole schedule. 8 are recorded. Two carry a verified manifest: a file listing every frame the render produced, with a checksum for each. The rest are in flight, stopped, or predate the record, and each says which.

frame 1 · 0:0021,600 · 15:0043,200 · 30:00
pass-011–6,319
pass-021–43,200
pass-082–12,884
verified by manifestobserved in the logno record
passstatusframesrunsgpu loggedchain breaksconfig hash
pass-01stopped / index says rendering6,319 on disk—10 h 43 m1—
pass-02complete43,200370 h 22 m07859a7f006e2
pass-03-rehearsalcomplete3,60015 h 31 m0717ce4250c1f
pass-04-rehearsal—2,400 on disk—3 h 39 m0—
pass-05-rehearsal—600 on disk—57 m 38 s3—
pass-06-rehearsal—1 on disk————
pass-07-rehearsalcomplete3,60015 h 26 m89468b49134d4
pass-08—12,868 on disk—20 h 35 m5—

Where a sequence record and the project index disagree about status, both are shown. The sequence record is the one written by the run.