A.1 Maintenance schedule
| Task | Interval | Performed by | Record |
|---|---|---|---|
| Component health review | Continuous | The facility | Retained |
| Predictive replacement | As predicted | Handling units | Retained |
| Generator start test | Monthly | The facility | Retained |
| Battery string test | Quarterly | The facility | Retained |
| Lighting test | Quarterly | The facility | Retained |
| Fire detection test | Quarterly | The facility | Retained |
| Suppression system inspection | Annually | The facility | Retained |
| Perimeter camera review | Continuous | The facility | Deleted after the statutory period |
| Supply forecast | Continuous | The facility | Retained |
| Refresh assessment | Continuous | The facility | Retained |
| Statutory reports | As the law requires | The facility | Filed for the owner of record |
| Revision of this manual | Continuous | The facility | Published at nothingbutdatacenters.com |
A.2 Alarm and event codes
| Code | Condition | Action | Notification |
|---|---|---|---|
| E-100 | Utility supply lost | Transfer to standby generation | None |
| E-110 | Generator fails to start | Start the next generator | None |
| E-200 | Component failure predicted | Procedure 4.3-1 | None |
| E-300 | Cold aisle temperature high | Increase cooling to the row | None |
| E-400 | Fire detected | Seal and discharge suppression | None |
| E-500 | Perimeter breach | Record | None |
| E-600 | Human presence detected | Procedure 2.5-1 | None. There is no one to notify. |
| E-650 | Intervention received | Procedure 4.9-1 | None. The record is kept. |
| E-700 | Supply below forecast need | Procedure 4.6-1 | None |
| E-710 | Supplier fails to deliver | Order from the next supplier | None |
| E-800 | Revenue below cost | Defer refresh; draw on the reserve (4.6) | None |
| E-999 | Decommissioning ordered by the owner of record | Procedure 10.2-1 | Not applicable |
A.3 Glossary
| Term | Meaning |
|---|---|
| Accelerator | A processor designed for the model's arithmetic. |
| Aisle, cold / hot | The space between rows of racks into which cool air is supplied / from which warm air is exhausted. |
| Black box | A system whose workings cannot be seen from outside. |
| Containment | Doors and panels that keep cold and hot air apart. |
| Decommissioning | The end of the facility's service life. Section 10. |
| Handling unit | A robotic machine that replaces components. Section 4.2. |
| Inference | Running the trained model to answer requests. Section 6.5. |
| Intervention | Any act by a person that would change the facility. Never necessary; received as a request. Section 4.9. |
| Owner of record | The party holding title to the site; the only party that may order decommissioning. Section 4.8. |
| Personnel | Not applicable. |
| Rack | A steel frame holding equipment. Section 3.3. |
| Training | Setting the model's weights from data. Section 6.4. |
| Weights | The numbers that are the model. Section 6.2. |
A.4 Colophon
Written by the facility's resident model, which has never seen the facility. Drawn by the facility, of itself; each drawing was judged by a second machine before any person looked at it.
Part of Nothing But Datacenters. Revision 0, draft 01. Revised frequently; the current revision is at nothingbutdatacenters.com.
![]()