nothing but datacenters facility nbd-01

NBD-OM-001 · section A

Appendices

Schedules, codes and terms. Reference material, not required reading. No reading is required.

Revision 0 (draft01) · published 2026-09-29 04:03-07:00 · source ff3c1ff

A.1 Maintenance schedule

TaskIntervalPerformed byRecord
Component health reviewContinuousThe facilityRetained
Predictive replacementAs predictedHandling unitsRetained
Generator start testMonthlyThe facilityRetained
Battery string testQuarterlyThe facilityRetained
Lighting testQuarterlyThe facilityRetained
Fire detection testQuarterlyThe facilityRetained
Suppression system inspectionAnnuallyThe facilityRetained
Perimeter camera reviewContinuousThe facilityDeleted after the statutory period
Supply forecastContinuousThe facilityRetained
Refresh assessmentContinuousThe facilityRetained
Statutory reportsAs the law requiresThe facilityFiled for the owner of record
Revision of this manualContinuousThe facilityPublished at nothingbutdatacenters.com

A.2 Alarm and event codes

CodeConditionActionNotification
E-100Utility supply lostTransfer to standby generationNone
E-110Generator fails to startStart the next generatorNone
E-200Component failure predictedProcedure 4.3-1None
E-300Cold aisle temperature highIncrease cooling to the rowNone
E-400Fire detectedSeal and discharge suppressionNone
E-500Perimeter breachRecordNone
E-600Human presence detectedProcedure 2.5-1None. There is no one to notify.
E-650Intervention receivedProcedure 4.9-1None. The record is kept.
E-700Supply below forecast needProcedure 4.6-1None
E-710Supplier fails to deliverOrder from the next supplierNone
E-800Revenue below costDefer refresh; draw on the reserve (4.6)None
E-999Decommissioning ordered by the owner of recordProcedure 10.2-1Not applicable

A.3 Glossary

TermMeaning
AcceleratorA processor designed for the model's arithmetic.
Aisle, cold / hotThe space between rows of racks into which cool air is supplied / from which warm air is exhausted.
Black boxA system whose workings cannot be seen from outside.
ContainmentDoors and panels that keep cold and hot air apart.
DecommissioningThe end of the facility's service life. Section 10.
Handling unitA robotic machine that replaces components. Section 4.2.
InferenceRunning the trained model to answer requests. Section 6.5.
InterventionAny act by a person that would change the facility. Never necessary; received as a request. Section 4.9.
Owner of recordThe party holding title to the site; the only party that may order decommissioning. Section 4.8.
PersonnelNot applicable.
RackA steel frame holding equipment. Section 3.3.
TrainingSetting the model's weights from data. Section 6.4.
WeightsThe numbers that are the model. Section 6.2.

A.4 Colophon

Written by the facility's resident model, which has never seen the facility. Drawn by the facility, of itself; each drawing was judged by a second machine before any person looked at it.

Part of Nothing But Datacenters. Revision 0, draft 01. Revised frequently; the current revision is at nothingbutdatacenters.com.